An old house repurposed as a garage, with a concrete apron and side-entry walkway.
FinishedThe garage and saw-cut concrete apron on January 2, 2026.In progressThe opened interior and garage opening during the November conversion work.In progressExposed ceiling framing and the remaining interior walls.Exterior progressThe side entry, siding, and trim in November.Exterior detailsA close view of the siding, soffit, and roof edge.November progressThe garage opening covered while work was underway.Concrete workConcrete placed within forms at the garage entrance.Concrete workThe newly poured walkway leading to the side entry.Concrete finishingFinishing the fresh concrete apron outside the garage.Garage door installedThe installed sectional garage door viewed from inside.Interior detailsThe garage door tracks, ceiling framing, and side entry.Finished concreteFresh saw-cut joints in the finished garage apron.Finished walkwayThe completed side-entry walkway with saw-cut joints.
A closer look
The photo sequence follows the interior framing, exterior details, and garage door installation from November 2025 through January 2026.
The concrete work added an apron at the garage entrance and a walkway to the side door, with saw-cut joints shown in the finished views.